2013, EGS (International) Ltd., London Array OFTO, Export Cable Route Post-Construction Survey (August-September 2013)

2013, EGS (International) Ltd., London Array OFTO, Export Cable Route Post-Construction Survey (August-September 2013)

Topic categories:

Geophysical

Last series update:

May 2022

MEDIN approved

Industry:

Wind

Collection date:

Aug 2013 - Sep 2013

Development:

London Array OFTO

Publication date:

May 2022

Round:

2

Organisation:

EGS (International) Ltd.

Phase:

Post-construction

Description

 In August 2013 EGS International were commissioned to carry out bathymetric surveys of the London Array Export cable routes. The Bathymetric surveys were to cover the 4 export cables corridor as laid and with a buffer of 25m either side of the outermost cable. The vessel mobilisation was carried out in Ramsgate between 27th and 30th August 2013. T...