Summary
The surveys were carried out as part of the environmental monitoring programme outlined within FEPA licences 31792/10/1 and 31814/10/2 for the Lynn and Inner Dowsing (LID) wind farms respectively. This series details the findings of the first and second year of post-construction surveys, and makes comparisons with the data collected during pre-cons...