2011, RPS, Lynn and Inner Dowsing, Decommisssioning of Meteorological Mast and Trial Pile

2011, RPS, Lynn and Inner Dowsing, Decommisssioning of Meteorological Mast and Trial Pile

Powered by: TCE
Don't show this

What is a series page?

Download MEDIN file

Last series update:

May 2021

Collection date:

February 2011 - February 2011

The collection date represents the period of data collection or study duration. For example: '16/04/2015-05/05/2015'

Publication date:

May 2021

The publication date is the date the series was published on the Marine Data Exchange. For example: '23/04/2017'

Published by:

The Crown Estate

Summary

Centrica Renewable Energy Ltd (CREL) on behalf of GLID Wind Farms TopCo Limited (GLID)
proposes to decommission and remove the trial pile (test pile) within the Lynn Offshore Wind Farm
(OWF) site.
The Lynn OWF site lies within the boundary of the Inner Dowsing, Race Bank and North Ridge
cSAC. Some of the qualifying features for which this cSAC is p...

Categories:
Meteorology
Categories indicate the area of study or data type the series is associated with. For example, a survey carrying out grab sampling would have the category 'Benthic Ecology', while a desktop study exploring the impact of substation design on bird nesting would have the categories ' Birds, Engineering Design'