Welcome to the Beta site. Beta means that you’re looking at the first version of the new Marine Data Exchange.
We’ll be continually testing and improving the site, so please let us know how we’re doing by getting in touch here

2011, RPS, Lynn and Inner Dowsing Offshore Wind Farms, Decommisssioning of Meteorological Mast and Trial Pile

2011, RPS, Lynn and Inner Dowsing Offshore Wind Farms, Decommisssioning of Meteorological Mast and Trial Pile

Topic categories:

Meteorology

Last series update:

May 2021

MEDIN approved

Industry:

Wind

Collection date:

Feb 2011 - Feb 2011

Development:

Lynn and Inner Dowsing

Publication date:

May 2021

Round:

1

Organisation:

RPS

Phase:

Post-construction

Description

Centrica Renewable Energy Ltd (CREL) on behalf of GLID Wind Farms TopCo Limited (GLID)
proposes to decommission and remove the trial pile (test pile) within the Lynn Offshore Wind Farm
(OWF) site.
The Lynn OWF site lies within the boundary of the Inner Dowsing, Race Bank and North Ridge
cSAC. Some of the qualifying features for which this cSAC is p...