Summary
Centrica Renewable Energy Ltd (CREL) commenced construction of the Lynn and Inner Dowsing (LID) offshore wind farms in 2007. The project consists of 27 turbines at Lynn and 27 turbines at Inner Dowsing and is located 5 km to 8.5 km off the Lincolnshire coast. Installation of the foundations and transition pieces at the two sites was completed in 20...