2007, Titan Environmental Surveys Ltd, Lynn and Inner Dowsing Offshore Wind Farm, Phase 2 (During Construction), Current and Sediment Survey

2007, Titan Environmental Surveys Ltd, Lynn and Inner Dowsing Offshore Wind Farm, Phase 2 (During Construction), Current and Sediment Survey

Top Categories:

Metocean

Description

Titan Environmental Surveys Ltd was commissioned by Centrica to undertake a campaign of
measurements of currents, temperature, salinity and turbidity at four sites within the Lynn and
Inner Dowsing Windfarm Development. The study was intended to provide metocean and
suspended particulate matter concentration data, for a feasibility study into land reclamation.
This report details the results obtained from Site 1 for the “During Construction” survey campaign.
Note that Site1 corresponds to Site 4 of the 2004 survey campaign

Report

Download All

2007, Titan Environmental Surveys Ltd, Lynn and Inner Dowsing Offshore Wind Farm, Phase 2 (During Construction), Current and Sediment Report