Welcome to the Beta site. Beta means that you’re looking at the first version of the new Marine Data Exchange.
We’ll be continually testing and improving the site, so please let us know how we’re doing by getting in touch here

2017, EGS, Lynn and Inner Dowsing, Post Construction Geophysical Survey

2017, EGS, Lynn and Inner Dowsing, Post Construction Geophysical Survey

Topic categories:

Geophysical

Last series update:

November 2021

MEDIN approved

Industry:

Wind

Collection date:

Sep 2017 - Sep 2017

Development:

Lynn and Inner Dowsing

Publication date:

Nov 2021

Round:

1

Organisation:

EGS

Phase:

Post-construction

Description

EGS (International) Limited (EGSi) were contracted by Siemens Gamesa Renewable Energy Ltd to
     undertake the 2017 post-construction geophysical survey of the L and ID OWF turbine locations, array
     cable and export cable routes. The main objective of the survey was to fulfil the L and ID Operations and
     Maintenance requirement by monitori...