Welcome to the Beta site. Beta means that you’re looking at the first version of the new Marine Data Exchange.
We’ll be continually testing and improving the site, so please let us know how we’re doing by getting in touch here

2010, Titan Environmental Surveys Ltd., Lynn and Inner Dowsing Offshore Wind Farms, Post-Construction Current and Turbidity Measurements

2010, Titan Environmental Surveys Ltd., Lynn and Inner Dowsing Offshore Wind Farms, Post-Construction Current and Turbidity Measurements

Topic categories:

Metocean

Sedimentology

Last series update:

May 2021

MEDIN approved

Industry:

Wind

Collection date:

Jul 2009 - Aug 2009

Development:

Lynn and Inner Dowsing

Publication date:

May 2021

Round:

1

Organisation:

Titan Environmental Surveys Ltd.

Phase:

Post-construction

Description

Titan Environmental Surveys Ltd was commissioned by Centrica to undertake a campaign of measurements of currents and turbidity at four sites within the Lynn and Inner Dowsing Wind Farm Development. Alongside this work, a 13 hour Vessel Mounted Acoustic Doppler Current Profiler (VMADCP) transect was required. This transect ran between the two wind f...