2011, EGS, Lynn and Inner Dowsing Offshore Wind Farms, Post-Construction Array Cable Geophysical Survey

2011, EGS, Lynn and Inner Dowsing Offshore Wind Farms, Post-Construction Array Cable Geophysical Survey

Topic categories:

Geophysical

Last series update:

May 2021

MEDIN approved

Industry:

Wind

Collection date:

Aug 2011 - Aug 2011

Development:

Lynn and Inner Dowsing

Publication date:

May 2021

Round:

1

Organisation:

EGS

Phase:

Post-construction

Description

EGS (International) Ltd was contracted to undertake a marine geophysical survey of
six cables within the Lynn Offshore Wind Farm (OWF) which had not been buried to
target depth during the original installation phase. The cables to be surveyed were
between the following wind turbines; LN01 to LN06, LN06 to LN11, LN11 to LN16,
LN16 to LN21, LN08 to L...