Summary
This report contains the operation details and results of the Lynn and Inner Dowsing Windfarm Mono Pile Foundation pre-construction side scan sonar debris clearance survey carried out for MT Højgaard A/S commisioned by Centrica. The fieldwork was undertaken between the 20th March and the 10th May 2007 by Fugro Survey Limited, using the M/V Genesis....