2009, EMU Ltd, Lynn and Inner Dowsing,  Hydrographic Monitoring Survey

2009, EMU Ltd, Lynn and Inner Dowsing, Hydrographic Monitoring Survey

Powered by: TCE
Don't show this

What is a series page?

Download MEDIN file

Last series update:

May 2021

Collection date:

June 2009 - September 2009

The collection date represents the period of data collection or study duration. For example: '16/04/2015-05/05/2015'

Publication date:

May 2021

The publication date is the date the series was published on the Marine Data Exchange. For example: '23/04/2017'

Published by:

The Crown Estate

Summary

Emu Ltd was commissioned by Centrica Renewable Energy Limited in 2009 to undertake a post construction hydrographic monitoring survey of the Lynn and Inner Dowsing wind farm sites and export power cables to shore in order to determine the bathymetry, seabed types and distribution of benthic habitats in the wind farm and associated surrounding areas...

Categories:
Benthic Ecology
Geophysical
Categories indicate the area of study or data type the series is associated with. For example, a survey carrying out grab sampling would have the category 'Benthic Ecology', while a desktop study exploring the impact of substation design on bird nesting would have the categories ' Birds, Engineering Design'
Available in this series:
Datasets
4
Reports
3