2010-2011, Brown and May Marine Ltd., Lynn and Inner Dowsing Offshore Wind Farms, Year 2 Post-construction Otter and Beam Trawl Survey

2010-2011, Brown and May Marine Ltd., Lynn and Inner Dowsing Offshore Wind Farms, Year 2 Post-construction Otter and Beam Trawl Survey

Top Categories:

Epifauna and Fish

Description

As part of the environmental monitoring programme outlined within FEPA licences 31792/10/1 and 31814/10/2 for the Lynn and Inner Dowsing (LID) wind farms respectively, both valid from the 10th October 2010 until the 31st October 2013, Brown & May Marine Ltd. was commissioned by Centrica Energy to undertake post-construction fisheries surveys within the LID wind farms.

This report details the findings of the ninth, tenth, eleventh and Twelfth   in a series of otter and beam trawl surveys to be undertaken in the area relevant to the operational LID wind farms. The survey is the Year 2 post construction survey which span across 2010 and 2011.

The survey methodology and sampling operations replicated that of the previous survey. These are detailed in the “LID Offshore Wind Farm Post-Construction Otter & Beam Trawl Survey, August 2009, Interim Report 

Dataset

Download All

GIS Data

Report

Download All

Interim Reports

Completion Reports