Summary
EMU was commisioned by Offshore Wind Power and Amec Wind in 2001 to carry out a geophysical work at two proposed wind farm sites, Lynn and Inner DowsingIt involved the collection of benthic grab samples and the use of a range of sampling techniques for assessment. Samples were collected for analysis of benthic invertebrates and particle size ...