Welcome to the Beta site. Beta means that you’re looking at the first version of the new Marine Data Exchange.
We’ll be continually testing and improving the site, so please let us know how we’re doing by getting in touch here

2006, National Physical Laboratory, Lynn and Inner Dowsing Offshore Wind Farms, Underwater Noise Monitoring During Test Pile Installation

2006, National Physical Laboratory, Lynn and Inner Dowsing Offshore Wind Farms, Underwater Noise Monitoring During Test Pile Installation

Top Categories:

Noise

Description

This report describes work undertaken by the National Physical Laboratory and Loughborough University to monitor the underwater acoustic noise during the installation of a test pile at the Lynn Offshore Wind Farm. The work took place on the morning of 17th April 2006 at 530 07.168’ N 00 24.567’ E approximately 6 km off-shore from Skegness. Detailed assessment of underwater noise levels were made throughout the piling sequence (a little over 4 hours) at two locations in a direction toward Gibraltar Point corresponding to ranges of 57 m and 1,850 m.

Report

Download All

Report