Summary
The Lynn and Inner Dowsing (hereafter LID) wind farms are each comprised of 27 wind turbines (54 in total) that were installed between April 2007 and the end of July 2008. All turbines were fully operational by March 2009. The Food and Environmental Protection Act (FEPA) 1985 Licences for the LID projects specified three main objectives in relation...