Welcome to the Beta site. Beta means that you’re looking at the first version of the new Marine Data Exchange.
We’ll be continually testing and improving the site, so please let us know how we’re doing by getting in touch here

2009, Centrica Renewable Energy Ltd., Post-Construction Monitoring

2009, Centrica Renewable Energy Ltd., Post-Construction Monitoring

Top Categories:

Birds
Epifauna and Fish

Description

Centrica Renewable Energy Ltd (CREL) commenced construction in 2007 of the Lynn and Inner Dowsing (LID) offshore wind farms located 5 km to 8.5 km off the Lincolnshire coast. The project consists of 27 turbines at Lynn and 27 turbines at Inner Dowsing This document provides a summary of the post-construction monitoring undertaken at LID during 2009, as required by the latest versions of the LID FEPA Consents 31792/09/0 and 31814/10/0. The FEPA licences are provided in Appendix 1.

Report

Download All

Report, Report and Appendices

Report, Report Addendum and Updated Appendices