Welcome to the Beta site. Beta means that you’re looking at the first version of the new Marine Data Exchange.
We’ll be continually testing and improving the site, so please let us know how we’re doing by getting in touch here

2009, Centrica Renewable Energy Ltd., Post-Construction Monitoring

2009, Centrica Renewable Energy Ltd., Post-Construction Monitoring

Topic categories:

Birds

Epifauna and Fish

Last series update:

May 2021

MEDIN approved

Industry:

Wind

Collection date:

Jan 2009 - Dec 2009

Development:

Lynn and Inner Dowsing

Publication date:

May 2021

Round:

1

Organisation:

Centrica Renewable Energy Ltd.

Phase:

Post-construction

Description

Centrica Renewable Energy Ltd (CREL) commenced construction in 2007 of the Lynn and Inner
Dowsing (LID) offshore wind farms located 5 km to 8.5 km off the Lincolnshire coast. The project
consists of 27 turbines at Lynn and 27 turbines at Inner Dowsing

This document provides a summary of the post-construction monitoring undertaken at LID during
2009, as required by the latest versions of the LID FEPA Consents 31792/09/0 and 31814/10/0.
The FEPA licences are provided in Appendix 1.