Summary
Centrica Renewable Energy Ltd (CREL) commenced construction in 2007 of the Lynn and Inner Dowsing (LID) offshore wind farms located 5 km to 8.5 km off the Lincolnshire coast. The project consists of 27 turbines at Lynn and 27 turbines at Inner Dowsing This document provides a summary of the post-construction monitoring undertaken at LID during 200...