Welcome to the Beta site. Beta means that you’re looking at the first version of the new Marine Data Exchange.
We’ll be continually testing and improving the site, so please let us know how we’re doing by getting in touch here

2012, Geomarine Ltd, Brough Head Wave Farm, Geotechnical Desk Study

2012, Geomarine Ltd, Brough Head Wave Farm, Geotechnical Desk Study

Topic categories:

Geotechnical

Last series update:

May 2021

MEDIN approved

Industry:

Wave

Collection date:

Feb 2012 - Feb 2012

Development:

Brough Head

Publication date:

May 2021

Organisation:

Geomarine Ltd

Phase:

Pre-construction

Description

Geomarine Ltd have been commissioned by Brough Head Wave Farm Ltd (BHWFL) to undertake a geotechnical desk study for phase 1 of the Brough Head Wave Farm which is to be located at Outshore Point on the west coast of Mainland, Orkney (Figure 1.1).