Welcome to the Beta site. Beta means that you’re looking at the first version of the new Marine Data Exchange.
We’ll be continually testing and improving the site, so please let us know how we’re doing by getting in touch here

2013, MMT, Buchan Deep Hywind Offshore Wind Farm, Geophysical Survey

2013, MMT, Buchan Deep Hywind Offshore Wind Farm, Geophysical Survey

Topic categories:

Geophysical

Last series update:

May 2021

MEDIN approved

Industry:

Wind

Collection date:

Jul 2013 - Sep 2013

Development:

Buchan Deep

Publication date:

May 2021

Round:

Demo

Organisation:

MMT

Phase:

Pre-construction

Description

MMT was contracted by Statoil to undertake a geophysical and benthic survey for the Hywind Offshore Windfarm – Seabed and sub-seabed mapping of development site and export cable corridor.

The scope of work included seabed and sub-seabed survey of the Hywind Offshore Windfarm development site and the export cable corridor. The main aims with the su...