Welcome to the Beta site. Beta means that you’re looking at the first version of the new Marine Data Exchange.
We’ll be continually testing and improving the site, so please let us know how we’re doing by getting in touch here

2007, Centre for Marine and Coastal Studies Ltd., (CMACS), Burbo Bank Offshore Wind Farm, Post-construction Intertidal Biotope Surveys

2007, Centre for Marine and Coastal Studies Ltd., (CMACS), Burbo Bank Offshore Wind Farm, Post-construction Intertidal Biotope Surveys

Topic categories:

Intertidal Ecology

Last series update:

May 2021

MEDIN approved

Industry:

Wind

Collection date:

Aug 2007 - Aug 2007

Development:

Burbo Bank

Publication date:

May 2021

Round:

1

Organisation:

Centre for Marine and Coastal Studies Ltd.

Phase:

Post-construction

Description

The report in this series presents results of a walkover biotope survey and sediment core sampling undertaken in August 2007. This survey follows baseline sampling at the same time of year in 2006. The survey consisted of a walk over biotope survey of the cable route corridor supported by sediment core samples from selected positions.