Summary
This report presents results of the surveys in the Ormonde field in 2010, the ‘construction phase’ and are the second set of surveys following the pre-construction (baseline) surveys in 2009. All surveys were carried out along strip-band transects (Figure 1) from the survey vessel Halcyon Days (Figure 2), where a pair of surveyors were observing fr...