Welcome to the Beta site. Beta means that you’re looking at the first version of the new Marine Data Exchange.
We’ll be continually testing and improving the site, so please let us know how we’re doing by getting in touch here

2008, HR Wallingford, Ormonde Offshore Wind Farm, Metocean Study

2008, HR Wallingford, Ormonde Offshore Wind Farm, Metocean Study

Topic categories:

Metocean

Last series update:

May 2021

MEDIN approved

Industry:

Wind

Collection date:

Jul 2008 - Jul 2008

Development:

Ormonde

Publication date:

May 2021

Round:

1

Organisation:

HR Wallingford

Phase:

Pre-construction

Description

The report provides metocean conditions for use in design, construction and operational assessments.  The variables considered are winds, waves, currents and sea levels.