Welcome to the Beta site. Beta means that you’re looking at the first version of the new Marine Data Exchange.
We’ll be continually testing and improving the site, so please let us know how we’re doing by getting in touch here

2015, DONG Energy, Race Bank Offshore Wind Farm, Geotechnical Interpretive Report

2015, DONG Energy, Race Bank Offshore Wind Farm, Geotechnical Interpretive Report

Topic categories:

Geotechnical

Last series update:

May 2021

Download MEDIN file

Industry:

Wind

Collection date:

Jul 2015 - Jul 2015

Development:

Race Bank

Publication date:

May 2021

Round:

2

Organisation:

DONG Energy

Phase:

Pre-construction

Description

The aim of this report is to analyse and interpret geotechnical classification tests, advanced laboratory tests and in-situ tests with emphasis on deriving geotechnical strength and stiffness parameters to be adopted for design of the MP's for the WTG's at ROW01. This is achieved by:

•	Clarification and presentation of performed geophysical and ge...