2010-2013, EMU, Race Bank, Waverider Buoy Deployment

2010-2013, EMU, Race Bank, Waverider Buoy Deployment

Powered by: TCE
Don't show this

What is a series page?

Download MEDIN file

Last series update:

May 2021

Collection date:

June 2010 - September 2013

The collection date represents the period of data collection or study duration. For example: '16/04/2015-05/05/2015'

Publication date:

May 2021

The publication date is the date the series was published on the Marine Data Exchange. For example: '23/04/2017'

Published by:

The Crown Estate

Summary

Emu Limited was commissioned by Centrica Renewable Energy Limited (CREL) to set up and maintain a Wave Data Acquisition System in the vicinity of Round 2 wind farms at Lincs and Race Bank. The scope of work comprised of real time monitoring of wave data within the development area.

Categories:
Metocean
Categories indicate the area of study or data type the series is associated with. For example, a survey carrying out grab sampling would have the category 'Benthic Ecology', while a desktop study exploring the impact of substation design on bird nesting would have the categories ' Birds, Engineering Design'
Available in this series:
Datasets
2
Reports
1