2007, CT Offshore, Burbo Bank Offshore Wind Farm, Post Installation Cable Maintenance Survey

2007, CT Offshore, Burbo Bank Offshore Wind Farm, Post Installation Cable Maintenance Survey

Top Categories:

Geophysical

Description

CT Offshore was awarded the maintenance survey contract requiring the complete Post Installation Maintenance Survey of the 33 kv power 
cable between the offshore WTG foundations and the land fall cables running ashore. 
The purpose of the survey was to determine the degree of protection provided to the cables based on the burial depth into the seabed, i.e. 
the seabed cover over the cables along the cable route in all positions along the route where a survey was practically possible. 
The cable burial depth below the existing seabed and the bottom position of the cables (x, y) were then to be presented in a survey map, 
upon completion of the survey. The report in this series details the survey, including equipment, methodology, data processing steps and recommendations with regards to further protection.