2007, CT Offshore, Burbo Bank Offshore Wind Farm, Post Installation Cable Maintenance Survey

2007, CT Offshore, Burbo Bank Offshore Wind Farm, Post Installation Cable Maintenance Survey

Topic categories:

Geophysical

Last series update:

May 2021

MEDIN approved

Industry:

Wind

Collection date:

May 2007 - Jun 2007

Development:

Burbo Bank

Publication date:

May 2021

Round:

1

Organisation:

CT Offshore

Phase:

Post-construction

Description

CT Offshore was awarded the maintenance survey contract requiring the complete Post Installation Maintenance Survey of the 33 kv power 
cable between the offshore WTG foundations and the land fall cables running ashore. 
The purpose of the survey was to determine the degree of protection provided to the cables based on the burial depth into the sea...