Summary
CT Offshore was awarded the maintenance survey contract requiring the complete Post Installation Maintenance Survey of the 33 kv power cable between the offshore WTG foundations and the land fall cables running ashore. The purpose of the survey was to determine the degree of protection provided to the cables based on the burial depth into the sea...