2013, Osiris Projects, Robin Rigg Offshore Wind Farm, Post Construction Geophysical Survey

2013, Osiris Projects, Robin Rigg Offshore Wind Farm, Post Construction Geophysical Survey

Topic categories:

Geophysical

Last series update:

May 2021

MEDIN approved

Industry:

Wind

Collection date:

Jan 2013 - Feb 2013

Development:

Robin Rigg

Publication date:

May 2021

Round:

1

Organisation:

Osiris Projects

Phase:

Post-construction

Description

Post Construction Geophysical Survey 2013 limited to 7 turbines, 2 substations and export cable route. The survey was undertaken during the period 14 January 2013 and 9 February 2013.  The surveys carried out were bathymetry and side-scan sonar.