2013, Osiris Projects, Robin Rigg Offshore Wind Farm, Post Construction Geophysical Survey

2013, Osiris Projects, Robin Rigg Offshore Wind Farm, Post Construction Geophysical Survey

Top Categories:

Geophysical

Description

Post Construction Geophysical Survey 2013 limited to 7 turbines, 2 substations and export cable route. The survey was undertaken during the period 14 January 2013 and 9 February 2013.  The surveys carried out were bathymetry and side-scan sonar.