2007, Osiris Projects, Robin Rigg Offshore Wind Farm, Pre-construction Geophysical Survey

2007, Osiris Projects, Robin Rigg Offshore Wind Farm, Pre-construction Geophysical Survey

Topic categories:

Geophysical

Last series update:

May 2021

MEDIN approved

Industry:

Wind

Collection date:

Jun 2007 - Jun 2007

Development:

Robin Rigg

Publication date:

May 2021

Round:

1

Organisation:

Osiris Projects

Phase:

Pre-construction

Description

On the instructions of Robin Rigg Offshore Wind Limited, Osiris Projects were
commissioned to undertake a pre-construction survey covering the proposed Robin
Rigg Offshore Wind Farm development site and associated cable. A total of over 400
line km of geophysical data were collected during the survey, which was undertaken
during the period 1st to 9th June 2007.
High-resolution side scan sonar, swath multi-beam and single beam bathymetry and
magnetometer data were acquired along all survey lines, which were run at 100m
centres, with cross lines at 200m centres, in order to accurately map the entire seabed
within the wind farm development area.
For the proposed cable route, eight parallel survey lines were run using swath
bathymetry and side scan sonar techniques, to provide full coverage of a 500m wide
corridor.
The primary objective of the survey was to map seabed features and bathymetry, both
within the wind farm area and along the associated cable route.