2012, EGS, Burbo Bank Offshore Wind Farm, Post-Construction Survey

2012, EGS, Burbo Bank Offshore Wind Farm, Post-Construction Survey

Topic categories:

Geophysical

Last series update:

May 2021

MEDIN approved

Industry:

Wind

Collection date:

Nov 2012 - Dec 2012

Development:

Burbo Bank

Publication date:

May 2021

Round:

1

Organisation:

EGS

Phase:

Post-construction

Description

DONG Energy contracted EGS (International) Ltd to undertake a bathymetric survey in the
post-construction (operational) phase of the project using both Multibeam Echo Sounder
(MBES) and Side Scan Sonar (SSS) survey techniques. The primary objective of the survey
was to assess the stability of the scour protection around the turbine foundations.
To ...