Welcome to the Beta site. Beta means that you’re looking at the first version of the new Marine Data Exchange.
We’ll be continually testing and improving the site, so please let us know how we’re doing by getting in touch here

2004, Cns Renewables Ltd., Scroby Sands Offshore Wind Farm, Scroby Sands Export Cable Project

2004, Cns Renewables Ltd., Scroby Sands Offshore Wind Farm, Scroby Sands Export Cable Project

Top Categories:

Geophysical

Description

On behalf of Vestas, CNS provided the Cable Installation Barges CIB Pontra Maris and the Fetsy L, complete with support anchor handling vessels and tow tug for the installation of the export cables. From this installation spread, the cables were simultaneously laid and buried from the Mean High Water Line to the wind farm location, all cables were within the pre-determined corridor. There was no evidence of anything which would impede the laying and burial of the cables along the proposed route.

Dataset

Download All

Depth of Burial of the Cables During Construction

Route Position Listings for Cable Routes

Daily Progress Reports from the Fetsy and Pontra Maris vessels

Report

Download All

Export Cables "As Built" Report

Specifications of the equipment used for the construction of the cable route

Volumes 1-5 As-Built Reports

A0 Charts

A3 Charts

Appendix B - As Built HV Cable Test