2004, Cns Renewables Ltd., Scroby Sands Offshore Wind Farm, Scroby Sands Export Cable Project

2004, Cns Renewables Ltd., Scroby Sands Offshore Wind Farm, Scroby Sands Export Cable Project

Topic categories:

Geophysical

Last series update:

May 2021

MEDIN approved

Industry:

Wind

Collection date:

Jan 2004 - Dec 2004

Development:

Scroby Sands

Publication date:

May 2021

Round:

1

Organisation:

Cns Renewables Ltd.

Phase:

Construction

Description

On behalf of Vestas, CNS provided the Cable Installation Barges CIB Pontra Maris and the Fetsy L, complete with support anchor handling vessels and tow tug for the installation of the export cables. From this installation spread, the cables were simultaneously laid and buried from the Mean High Water Line to the wind farm location, all cables were within the pre-determined corridor.  There was no evidence of anything which would impede the laying and burial of the cables along the proposed route.