Summary
On the instructions of Mammoet Van Oord, a multi-beam bathymetry survey has been performed over the proposed Burbo Offshore Wind Farm development site, off the north coast of the Wirral peninsula, Merseyside, UK. In addition, further multi-beam bathymetry data were collected within a 400m x 400m, box-shaped area of seabed at Mostyn Deep, in the out...