Welcome to the Beta site. Beta means that you’re looking at the first version of the new Marine Data Exchange.
We’ll be continually testing and improving the site, so please let us know how we’re doing by getting in touch here

2008, ECON, Scroby Sands Offshore Wind Farm, Seal Monitoring, Analysis of the 2006 post-construction aerial surveys and summary of the monitoring programme results from 2002-2006

2008, ECON, Scroby Sands Offshore Wind Farm, Seal Monitoring, Analysis of the 2006 post-construction aerial surveys and summary of the monitoring programme results from 2002-2006

Topic categories:

Marine Mammals

Last series update:

May 2021

MEDIN approved

Industry:

Wind

Collection date:

Mar 2002 - Oct 2006

Development:

Scroby Sands

Publication date:

May 2021

Round:

1

Organisation:

ECON

Phase:

Post-construction

Description

The schedule to Licence required that a monitoring programme be carried out to determine the impact of the wind farm on the seal populations. This was specified as two aerial photographic surveys from fixed wing aircraft per month at low water for the six summer months (April to September) pre, during and post construction. Baseline pre-constructio...