2008, GEO, Sheringham Shoal, Cone Penetration Test Geotechnical Investigation

2008, GEO, Sheringham Shoal, Cone Penetration Test Geotechnical Investigation

Powered by: TCE
Don't show this

What is a series page?

Download MEDIN file

Last series update:

May 2021

Collection date:

October 2008 - October 2008

The collection date represents the period of data collection or study duration. For example: '16/04/2015-05/05/2015'

Publication date:

May 2021

The publication date is the date the series was published on the Marine Data Exchange. For example: '23/04/2017'

Published by:

The Crown Estate

Summary

Scira Offshore Energy Ltd. contracted GEO to deliver equipment and personnel for a geotechnical
site investigation for offshore windmill foundations and substations. The works were performed from the Company supplied vessel “Geofjord” between 29th September and 16th October 2008. The investigation included 101 continuous CPTs (CPTU) in 86 locations...

Categories:
Geotechnical
Categories indicate the area of study or data type the series is associated with. For example, a survey carrying out grab sampling would have the category 'Benthic Ecology', while a desktop study exploring the impact of substation design on bird nesting would have the categories ' Birds, Engineering Design'
Available in this series:
Datasets
1
Reports
1