Summary
StatoilHydro is planning to install two export cables to connect its Sheringham Shoal Offshore Wind Farm to the UK National Grid. The landfall will be at Weybourne on the North Norfolk coast. This desk study was commissioned to identify the optimum burial depth of the cables at the landfall by investigating the surface geology. Design requirements ...