Welcome to the Beta site. Beta means that you’re looking at the first version of the new Marine Data Exchange.
We’ll be continually testing and improving the site, so please let us know how we’re doing by getting in touch here

2006, Scira Offshore Energy Ltd., Sheringham Shoal Offshore Windfarm, Environmental Statement, Appendix 15.7

2006, Scira Offshore Energy Ltd., Sheringham Shoal Offshore Windfarm, Environmental Statement, Appendix 15.7

Top Categories:

Archaeology

Description

This project examines the archaeological baseline studies carried out at the site of the Sheringham Shoal Offshore wind farm.  The baseline runs from Lower Palaeolithic 680,000-c. 250,000 BP to Modern 1800-present.  During this time climatic and environmental conditions in Britain varied considerably.  This project examines the change through this time and the impacts on the study areas.

Report

Download All

Archaeological Baseline Studies, Report