Welcome to the Beta site. Beta means that you’re looking at the first version of the new Marine Data Exchange.
We’ll be continually testing and improving the site, so please let us know how we’re doing by getting in touch here

2015, Brown and May Marine Ltd., Sheringham Shoal Offshore Wind Farm, Post-cable Installation Elasmobranch Survey

2015, Brown and May Marine Ltd., Sheringham Shoal Offshore Wind Farm, Post-cable Installation Elasmobranch Survey

Topic categories:

Epifauna and Fish

Last series update:

December 2021

MEDIN approved

Industry:

Wind

Collection date:

Aug 2015 - Aug 2015

Development:

Sheringham Shoal

Publication date:

Dec 2021

Round:

2

Organisation:

Brown and May Marine Ltd.

Phase:

Post-construction

Description

A longline survey was undertaken in the area relevant to the Sheringham Shoal Offshore Wind Farm export cable between the 16th and 21st of August 2015. The survey methodology replicated that of the August 2010 pre-installation survey, and the November 2012 and August 2013 post-installation survey.
The objective of the survey was to assess whether t...