Summary
A longline survey was undertaken in the area relevant to the Sheringham Shoal Offshore Wind Farm export cable between the 16th and 21st of August 2015. The survey methodology replicated that of the August 2010 pre-installation survey, and the November 2012 and August 2013 post-installation survey. The objective of the survey was to assess whether t...