Welcome to the Beta site. Beta means that you’re looking at the first version of the new Marine Data Exchange.
We’ll be continually testing and improving the site, so please let us know how we’re doing by getting in touch here

2006, Osiris Projects, Burbo Bank Offshore Wind Farm, Rock Armour Post-Lay Inspection Survey

2006, Osiris Projects, Burbo Bank Offshore Wind Farm, Rock Armour Post-Lay Inspection Survey

Topic categories:

Geophysical

Last series update:

May 2021

MEDIN approved

Industry:

Wind

Collection date:

Nov 2006 - Nov 2006

Development:

Burbo Bank

Publication date:

May 2021

Round:

1

Organisation:

Osiris Projects

Phase:

Pre-construction

Description

Osiris Projects were commissioned by Ocean Marine Research Ltd on behalf of Peter
Madsen Rederi A/S, to carry out a bathymetric survey at the Burbo Bank offshore wind
farm, where rock dump operations around existing turbine monopiles have recently
been completed.
The scope of work involved surveying a total of twenty five 75m x 75m boxes, centred
o...