Summary
The interim report in this series details the results of the first of two elasmobranch surveys to be undertaken in the area relevant to the Sheringham Shoal Offshore Wind Farm export cable. This survey was completed prior to the installation of the export cable, with the second survey to be undertaken within two months of the cable becoming operati...