Welcome to the Beta site. Beta means that you’re looking at the first version of the new Marine Data Exchange.
We’ll be continually testing and improving the site, so please let us know how we’re doing by getting in touch here

2014-2015, Fugro EMU Limited, Sheringham Shoal Offshore Windfarm, Marine Survey

2014-2015, Fugro EMU Limited, Sheringham Shoal Offshore Windfarm, Marine Survey

Topic categories:

Geophysical

Last series update:

December 2021

MEDIN approved

Industry:

Wind

Collection date:

Nov 2014 - Jan 2015

Development:

Sheringham Shoal

Publication date:

Dec 2021

Round:

2

Organisation:

Fugro EMU Limited

Phase:

Post-construction

Description

Fugro EMU Limited (Fugro EMU) was commissioned by Scira Offshore Energy Limited to conduct a
bathymetry and sidescan sonar (SSS) survey of the Sheringham Shoal Offshore Wind Farm and export
cables. The survey was required to fulfil Marine Management Organisation (MMO) requirements for
post-construction monitoring.