Summary
A longline survey was undertaken in the area relevant to the Sheringham Shoal Offshore Wind Farm export cable between the 27th and 29th of August 2013. The survey methodology replicated that of the August 2010 pre-installation survey, and the November 2012 post-installation survey, and was carried out to minimise the potential for seasonality affec...