Welcome to the Beta site. Beta means that you’re looking at the first version of the new Marine Data Exchange.
We’ll be continually testing and improving the site, so please let us know how we’re doing by getting in touch here

2013, Brown and May Marine Ltd., Sheringham Shoal Offshore Wind Farm, Post-cable Installation Elasmobranch Survey

2013, Brown and May Marine Ltd., Sheringham Shoal Offshore Wind Farm, Post-cable Installation Elasmobranch Survey

Topic categories:

Epifauna and Fish

Last series update:

May 2021

Download MEDIN file

Industry:

Wind

Collection date:

Aug 2013 - Aug 2013

Development:

Sheringham Shoal

Publication date:

May 2021

Round:

2

Organisation:

Brown and May Marine Ltd.

Phase:

Post-construction

Description

A longline survey was undertaken in the area relevant to the Sheringham Shoal Offshore Wind Farm export cable between the 27th and 29th of August 2013. The survey methodology replicated that of the August 2010 pre-installation survey, and the November 2012 post-installation survey, and was carried out to minimise the potential for seasonality affec...