2014, Natural Research Projects, Skerries, Seabird Pilot Study

2014, Natural Research Projects, Skerries, Seabird Pilot Study

Powered by: TCE
Don't show this

What is a series page?

Download MEDIN file

Last series update:

March 2026

Collection date:

April 2014 - August 2014

The collection date represents the period of data collection or study duration. For example: '16/04/2015-05/05/2015'

Publication date:

May 2021

The publication date is the date the series was published on the Marine Data Exchange. For example: '23/04/2017'

Published by:

The Crown Estate

Summary

SeaGeneration Wales (SGW), a wholly owned subsidiary of Marine Current Turbines, is required to undertake pre-installation monitoring of seabirds in the vicinity of the Skerries Tidal Stream Array (the Project) off Anglesey. This 10MW tidal stream project received consent in 2012 but installation work has not yet commenced.

A requirement of the Ma...

Categories:
Birds
Onshore
Categories indicate the area of study or data type the series is associated with. For example, a survey carrying out grab sampling would have the category 'Benthic Ecology', while a desktop study exploring the impact of substation design on bird nesting would have the categories ' Birds, Engineering Design'
Available in this series:
Reports
1

Deep dive in the data

Choose what you wish to look into:

Dataset

|

Report

|

Other

Report

Report

This technical report presents the results of the 4-month ornithological pre-installation pilot study
undertaken by Natural Research (Projects) Ltd ( NRP) in the 2014 seabird breeding season (mid-April
to mid-August 2014). NRP was asked to undertake this study because of it recognised expertise and
experience in ornithological impact assessment and associated surveys for w...
Read More