Welcome to the Beta site. Beta means that you’re looking at the first version of the new Marine Data Exchange.
We’ll be continually testing and improving the site, so please let us know how we’re doing by getting in touch here

2016, Bibby HydroMap Limited, Teesside Offshore Wind Farm, Operations and Maintenance Geophysical Surveys (September 2016)

2016, Bibby HydroMap Limited, Teesside Offshore Wind Farm, Operations and Maintenance Geophysical Surveys (September 2016)

Topic categories:

Geophysical

Last series update:

November 2021

MEDIN approved

Industry:

Wind

Collection date:

Sep 2016 - Sep 2016

Development:

Teesside

Publication date:

Nov 2021

Round:

1

Organisation:

Bibby HydroMap Limited

Phase:

Post-construction

Description

Bibby HydroMap were commissioned in September 2016 by EDF Energy Renewables to carry out
geophysical and high resolution surveys of Teesside Offshore Wind Farm (OWF) as part of ongoing
monitoring of the site.
The survey was completed under Bibby HydroMap’s Terms and Conditions. The survey was carried
out between 07/09/2016 and 12/09/2016.