2016, Bibby HydroMap, Teesside, Operations and Maintenance Geophysical Surveys

2016, Bibby HydroMap, Teesside, Operations and Maintenance Geophysical Surveys

Powered by: TCE
Don't show this

What is a series page?

Download MEDIN file

Last series update:

March 2026

Collection date:

September 2016 - September 2016

The collection date represents the period of data collection or study duration. For example: '16/04/2015-05/05/2015'

Publication date:

November 2021

The publication date is the date the series was published on the Marine Data Exchange. For example: '23/04/2017'

Published by:

The Crown Estate

Summary

Bibby HydroMap were commissioned in September 2016 by EDF Energy Renewables to carry out geophysical and high resolution surveys of Teesside Offshore Wind Farm (OWF) as part of ongoing monitoring of the site. The survey was completed under Bibby HydroMap’s Terms and Conditions. The survey was carried out between 07/09/2016 and 12/09/2016.

Categories:
Geophysical
Categories indicate the area of study or data type the series is associated with. For example, a survey carrying out grab sampling would have the category 'Benthic Ecology', while a desktop study exploring the impact of substation design on bird nesting would have the categories ' Birds, Engineering Design'
Available in this series:
Datasets
3
Reports
3