Welcome to the Beta site. Beta means that you’re looking at the first version of the new Marine Data Exchange.
We’ll be continually testing and improving the site, so please let us know how we’re doing by getting in touch here

2015, Bibby HydroMap, Teesside Offshore Windfarm, Operations and Maintenance Geophysical Surveys (September)

2015, Bibby HydroMap, Teesside Offshore Windfarm, Operations and Maintenance Geophysical Surveys (September)

Topic categories:

Geophysical

Last series update:

November 2021

MEDIN approved

Industry:

Wind

Collection date:

Sep 2015 - Sep 2015

Development:

Teesside

Publication date:

Nov 2021

Round:

1

Organisation:

Bibby HydroMap

Phase:

Post-construction

Description

Bibby HydroMap were commissioned in September 2015 by EDF Energy Renewables to carry out geophysical and high-resolution bathymetric surveys of Teesside Offshore Wind Farm (OWF) as part of ongoing monitoring of the site. The survey was completed under Bibby HydroMap’s Terms and
     Conditions. The surveys were carried out between 8th a...