2015, Osiris Projects, Teesside, Geophysical Survey (Spring)

2015, Osiris Projects, Teesside, Geophysical Survey (Spring)

Powered by: TCE
Don't show this

What is a series page?

Download MEDIN file

Last series update:

November 2021

Collection date:

February 2015 - March 2015

The collection date represents the period of data collection or study duration. For example: '16/04/2015-05/05/2015'

Publication date:

November 2021

The publication date is the date the series was published on the Marine Data Exchange. For example: '23/04/2017'

Published by:

The Crown Estate

Summary

Teesside Offshore Wind Farm (OWF) is a 62 MW site comprised of 27 turbines, owned and operated
by Teesside Windfarm Limited (TWL). Osiris Projects were contracted to provide surveys in order to
monitor the seabed state, specifically the identification of seabed debris and scour or sediment
accretion within the wind farm area.
The survey was complet...

Categories:
Geophysical
Categories indicate the area of study or data type the series is associated with. For example, a survey carrying out grab sampling would have the category 'Benthic Ecology', while a desktop study exploring the impact of substation design on bird nesting would have the categories ' Birds, Engineering Design'
Available in this series:
Datasets
4
Reports
3