Welcome to the Beta site. Beta means that you’re looking at the first version of the new Marine Data Exchange.
We’ll be continually testing and improving the site, so please let us know how we’re doing by getting in touch here

2011, Entec UK Limited, Teesside Offshore Wind Farm, Pre-Construction FEPA Monitoring

2011, Entec UK Limited, Teesside Offshore Wind Farm, Pre-Construction FEPA Monitoring

Topic categories:

Archaeology

Benthic Ecology

Geophysical

Marine Mammals

Last series update:

May 2021

MEDIN approved

Industry:

Wind

Collection date:

Mar 2010 - Dec 2010

Development:

Teesside

Publication date:

May 2021

Round:

1

Organisation:

Entec UK Limited

Phase:

Pre-construction

Description

This report was produced to provide a summary of the results of the pre-construction baseline monitoring for the Teesside Offshore Wind Farm. This monitoring was required as part of the conditions attached to the FEPA consent and followed the programme set out within the Environmental Monitoring Plan.The pre-construction monitoring comprised the fo...