Welcome to the Beta site. Beta means that you’re looking at the first version of the new Marine Data Exchange.
We’ll be continually testing and improving the site, so please let us know how we’re doing by getting in touch here

2017, Bibby HydroMap, Teeside Offshore Windfarm, Operations and Maintenance Geophysical Surveys (July 2017)

2017, Bibby HydroMap, Teeside Offshore Windfarm, Operations and Maintenance Geophysical Surveys (July 2017)

Topic categories:

Geophysical

Last series update:

November 2021

MEDIN approved

Industry:

Wind

Collection date:

Jul 2017 - Jul 2017

Development:

Teesside

Publication date:

Nov 2021

Round:

1

Organisation:

Bibby HydroMap

Phase:

Post-construction

Description

Bibby HydroMap were commissioned by EDF Energy Renewables, in July 2017, to undertake a 350m x 350m debris survey around turbine 14B on the Teesside Offshore Wind Farm (OWF), prior to the emplacement of a jack‐up rig on the site. Once mobilised, the client also requested a further survey of the remainder of the wind farm site. The location of the w...