Welcome to the Beta site. Beta means that you’re looking at the first version of the new Marine Data Exchange.
We’ll be continually testing and improving the site, so please let us know how we’re doing by getting in touch here

2014, Osiris Projects, Teesside Offshore Wind Farm, Operations and Maintenance Geophysical Survey (AugSept)

2014, Osiris Projects, Teesside Offshore Wind Farm, Operations and Maintenance Geophysical Survey (AugSept)

Topic categories:

Geophysical

Last series update:

November 2021

MEDIN approved

Industry:

Wind

Collection date:

Aug 2014 - Sep 2014

Development:

Teesside

Publication date:

Nov 2021

Round:

1

Organisation:

Osiris Projects

Phase:

Post-construction

Description

Operations and maintenance geophysical survey for Teesside Offshore Wind Farm between 19 August and 3 September 2014.
The aims of the survey were to; To identify debris within the construction area; To identify changes to seabed morphology; To enable the evaluation of the effectiveness of installed scour protection and ratify the predictions for sc...