2013, dB Attenuation, Teesside, Acoustic Survey

2013, dB Attenuation, Teesside, Acoustic Survey

Powered by: TCE
Don't show this

What is a series page?

Download MEDIN file

Last series update:

May 2021

Collection date:

September 2013 - September 2013

The collection date represents the period of data collection or study duration. For example: '16/04/2015-05/05/2015'

Publication date:

May 2021

The publication date is the date the series was published on the Marine Data Exchange. For example: '23/04/2017'

Published by:

The Crown Estate

Summary

Acoustic survey undertaken by dB Attentuation after the completion and energisation of Teesside Offshore Wind Farm and Warrenby Substation to assess whether the planning design criteria have been met.

Categories:
Noise
Categories indicate the area of study or data type the series is associated with. For example, a survey carrying out grab sampling would have the category 'Benthic Ecology', while a desktop study exploring the impact of substation design on bird nesting would have the categories ' Birds, Engineering Design'
Available in this series:
Reports
1