2005, EMU Ltd., Triton Knoll Offshore Wind Farm, Site Selection Assessment

2005, EMU Ltd., Triton Knoll Offshore Wind Farm, Site Selection Assessment

Powered by: TCE
Don't show this

What is a series page?

Download MEDIN file

Last series update:

May 2021

Collection date:

May 2005 - May 2005

The collection date represents the period of data collection or study duration. For example: '16/04/2015-05/05/2015'

Publication date:

May 2021

The publication date is the date the series was published on the Marine Data Exchange. For example: '23/04/2017'

Published by:

The Crown Estate

Summary

In December 2003, npower renewables (NR) was granted a Round II wind farm exploration licence by the
Crown Estate in an area known as Triton Knoll. In April 2004, NR commissioned Emu Ltd to undertake a
GIS-based review of the constraints in relation to the Triton Knoll site. This review concluded that due to
the number of potential constraints asso...

Categories:
Other
Categories indicate the area of study or data type the series is associated with. For example, a survey carrying out grab sampling would have the category 'Benthic Ecology', while a desktop study exploring the impact of substation design on bird nesting would have the categories ' Birds, Engineering Design'
Available in this series:
Reports
2