2012, Fugro Engineering Services, Burbo Bank Extension Offshore Wind Farm, Geotechnical Site Investigation

2012, Fugro Engineering Services, Burbo Bank Extension Offshore Wind Farm, Geotechnical Site Investigation

Top Categories:

Geotechnical

Description

A ground investigation has been carried out by Fugro Seacore Limited (FSCL) on the
instructions of DONG Energy Burbo Bank Extension (UK) Limited (the Client) and under
the supervision of Ramboll and RPS Engineering (the Engineers), at Burbo Bank
Extension Offshore Wind Farm. The site is located west of the existing Burbo Bank
Offshore Wind Farm. This summary contains an overview of the key findings and conclusions presented in the
Part B Report and Part C Report. No reliance should be placed on any part of the
summary until the whole of the report has been read; other sections of the report may
contain information which alters the context of the summarised findings.

Dataset

Download All

AGS Data - Substation SSC

AGS Data - Turbine and Substation Locations

Report

Download All

Executive Summary and Part B and C Reports - Substation SSC

Executive Summary and Part B and C Reports - Turbine and Substation Locations